Skip to main content

Further extension in power cuts inevitable: PUCSL

The third Coal power plant in Nuraichcholai has been shut down due to a technical fault and as a result, power cuts may have to be extended, the Public Utilities Commission of Sri Lanka (PUCSL) said.

Comments

Popular posts from this blog

Govt. directly handles matter with Chinese Embassy

The government has reportedly taken over the handling of the diplomatic issue regarding the Yuan Wang 5 ship directly through the Chinese Embassy in Colombo instead of going through the Sri Lankan mission in Beijing, Daily Mirror learns.